Availability: | |
---|---|
Quantity: | |
KDO(N)-1500Y
Jinhua
1. Plant parameters:
Inlet air flow rate: 9500Nm³/h (0℃,101.325kPa)
Inlet air pressure: 0.85MPaG
Liquid O2 flow rate: 1500 Nm³/h (2000L/h)
Liquid O2 purity 99.6%
Or: Liquid N2 flow rate: 1500 Nm³/h (2000L/h)
Liquid N2 purity 99.99%
2. Total Power and water consumption
Item | Power kW | Water consumption Ton/h | Remark | |
Motor power | Shaft power | |||
Air Compressor | 1100 | 1000 | 140 | |
Recycle compressor | 1150 | 1050 | 150 | |
Pre-cooling | 58 | 50 | 48 | |
Elec-heater | 150 | 55 | 0 |
|
Expander â… | 6 | 2 | 30 | |
Expander â…¡ | 6 | 2 | 15 | |
Total | 2470 | 2159 | 383 |
2. Breakdown Price
No. | Name | Qty | Note |
1. | Air compressor | 1 | Korea Samsung |
2. | Air filter | 1 | Wuxi Anhuo |
3. | Recycling compressor | 1 | Korea Samsung |
4. | Buffer tank 10m³ | 1 | |
5. | Pre-cooler SAYL-9500/10 | 1 | Hangzhou Sanlior Jialian |
6. | Purification system HXK-9500/10 | 1 | PLC Auto control |
7. | Fractionating column KDO(N)-1500Y | 1 | In skid, PLC Auto control |
8. | Oil Turbo-Expander â… | 1 | Jianyang Or Blessed |
9. | Oil Turbo-Expander â…¡ | 1 | Jianyang Or Blessed |
10. | After cooler | 2 | |
11. | Instrument Control system | 1 | Siemens PLC S7-300 And Auto control valves |
12. | Electrical Control system | 1 | |
13. | Engineering material | ||
14. | Total Price | FOB Shanghai |
Q1. What is your main product ?
A: Oxygen gas plant , nitrogen gas plant , liquid oxygen plant , liquid nitrogen plant , special gas plant ...
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% T/T or L/C at sign before delivery. Welcome to inspect the products before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 60 to 90 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the client's request ?
A: Yes, we can produce by your request or technical drawings. We can build the molds and fixtures.
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
For more details please contact me , Welcome to visit our factory
1. Plant parameters:
Inlet air flow rate: 9500Nm³/h (0℃,101.325kPa)
Inlet air pressure: 0.85MPaG
Liquid O2 flow rate: 1500 Nm³/h (2000L/h)
Liquid O2 purity 99.6%
Or: Liquid N2 flow rate: 1500 Nm³/h (2000L/h)
Liquid N2 purity 99.99%
2. Total Power and water consumption
Item | Power kW | Water consumption Ton/h | Remark | |
Motor power | Shaft power | |||
Air Compressor | 1100 | 1000 | 140 | |
Recycle compressor | 1150 | 1050 | 150 | |
Pre-cooling | 58 | 50 | 48 | |
Elec-heater | 150 | 55 | 0 |
|
Expander â… | 6 | 2 | 30 | |
Expander â…¡ | 6 | 2 | 15 | |
Total | 2470 | 2159 | 383 |
2. Breakdown Price
No. | Name | Qty | Note |
1. | Air compressor | 1 | Korea Samsung |
2. | Air filter | 1 | Wuxi Anhuo |
3. | Recycling compressor | 1 | Korea Samsung |
4. | Buffer tank 10m³ | 1 | |
5. | Pre-cooler SAYL-9500/10 | 1 | Hangzhou Sanlior Jialian |
6. | Purification system HXK-9500/10 | 1 | PLC Auto control |
7. | Fractionating column KDO(N)-1500Y | 1 | In skid, PLC Auto control |
8. | Oil Turbo-Expander â… | 1 | Jianyang Or Blessed |
9. | Oil Turbo-Expander â…¡ | 1 | Jianyang Or Blessed |
10. | After cooler | 2 | |
11. | Instrument Control system | 1 | Siemens PLC S7-300 And Auto control valves |
12. | Electrical Control system | 1 | |
13. | Engineering material | ||
14. | Total Price | FOB Shanghai |
Q1. What is your main product ?
A: Oxygen gas plant , nitrogen gas plant , liquid oxygen plant , liquid nitrogen plant , special gas plant ...
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% T/T or L/C at sign before delivery. Welcome to inspect the products before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 60 to 90 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the client's request ?
A: Yes, we can produce by your request or technical drawings. We can build the molds and fixtures.
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
For more details please contact me , Welcome to visit our factory
| No.73 Beidou Avenue, Longyou Economic Development Zone, Longyou county, Quzhou City .Zhe jiang province , China . |
| +86-13429100132 |
|