简体中文
You are here: Home / Products / High purity Nitrogen gas plant / 3000Nm3/h Nitrogen Gas Plant

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

3000Nm3/h Nitrogen Gas Plant

1. Plant parameters:
Inlet air flow rate: 8500m³/h (20℃,101.325kPa)
Inlet air pressure: 7.8barG
Nitrogen flow rate: 3000Nm³/h
Liquid Nitrogen flow rate: 100Nm³/h
Nitrogen purity 10ppm
Outlet pressure 7barG
 
Availability:
Quantity:
  • KDN-3000

  • Jinhua


1. Plant parameters:

Inlet air flow rate: 8500m³/h (20℃,101.325kPa)

Inlet air pressure: 7.8barG

Nitrogen flow rate:  3000Nm³/h

Liquid Nitrogen flow rate: 100Nm³/h

Nitrogen purity 10ppm

Outlet pressure 7barG


2. Total Power and water consumption

Item


Power kW

Water

consumption Ton/h


Remark


Motor power

Shaft

power

Air Compressor

1000

900

110


Pre-cooling

52

42

40


Elec-heater

120

42

0

Total

1172

984

150



1. Breakdown Price

Item


Description

Qty

Local

1.

Air Compressor

1

Atlas

2.

Air filter

1

Hangzhou Jinhua

3.

Pre-cooler system

2

Hangzhou Jinhua

4.

Purification system (PLC Auto control)

1

Hangzhou Jinhua

5.

Fractionating column (PLC Auto control)

1

Hangzhou Jinhua

6.

Turbo-Expander

1

Xida

7.

Nitrogen storage tank 50m³ 1.6MPa

1

Hangzhou Jinhua

8.

Vaporizer 5000Nm³/h

1

Hangzhou Jinhua

9.

Pressure regulator station

1

Hangzhou Jinhua

10.

Instrument control system PLC

1

Siemens

11.

Electronic control system

1

Hangzhou Jinhua

12.

Engineering material and design

1set

Hangzhou Jinhua


Total






Q1. What is your main product ? 

A: Oxygen gas plant , nitrogen gas plant , liquid oxygen plant , liquid nitrogen plant , special gas plant ... 

Q2. What is your terms of payment? 

A: T/T 30% as deposit, and 70% T/T or L/C at sign before delivery. Welcome to inspect the products before you pay the balance. 

Q3. What is your terms of delivery? 

A: EXW, FOB, CFR, CIF. 

Q4. How about your delivery time? 

A: Generally, it will take 60 to 90 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. 

Q5. Can you produce according to the client's request ? 

A: Yes, we can produce by your request or technical drawings. We can build the molds and fixtures. 

Q6: How do you make our business long-term and good relationship? 

A:1. We keep good quality and competitive price to ensure our customers benefit ; 

2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from. 

For more details please contact me , Welcome to visit our factory



Previous: 
Next: