简体中文
You are here: Home / Products / Oxygen and nitrogen plant / KDON-550/1100 Oxygen And Nitrogen Plant

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

KDON-550/1100 Oxygen And Nitrogen Plant

1. Plant parameters:
Inlet air flow rate: 3300Nm³/h (0℃,101.325kPa)
Inlet air pressure: 7.5barG
Oxygen flow rate: 550Nm³/h
Oxygen purity ≥99.6%
Nitrogen flow rate: 1100Nm³/h
Nitrogen purity ≥99.99%
 
Availability:
Quantity:
  • KDON-550/1000

  • Jinhua


1. Plant parameters:

Inlet air flow rate: 3300Nm³/h 0℃,101.325kPa

Inlet air pressure: 7.5barG

Oxygen flow rate: 550Nm³/h

Oxygen purity ≥99.6%

Nitrogen flow rate: 1100Nm³/h

Nitrogen purity ≥99.99%


2. Total Power and water consumption

Item


Power kW

Water

consumption Ton/h


Remark


Motor power

Shaft

power

Air Compressor

320

300

30


Pre-cooling

21

17

16


Elec-heater

60

20

0

Cold box heater

24

0

0


Total

425

337

46



 Breakdown Price

Item


Description

Qty

Manufacturer

1.

Air compresor

2

Atlas

2.

Air buffer tank

10m³ 7bar

1

Hangzhou Jinhua

3.

Oil and water filters

3

Hangzhou Jinhua

4.

Pre-cooler system

1

Hangzhou Sanli

5.

Purification system Manual control

1

Hangzhou Jinhua

6.

Fractionating column Manual control

1

Hangzhou Jinhua

7.

Turbo-Expander

1

Suzhou

Xida

8.

Control system

1

Hangzhou Jinhua

9.

Engineering material Cooling water system, Insulation material, engineering piping,ect.

1

Hangzhou Jinhua


Total





Q1. What is your main product ? 

A: Oxygen gas plant , nitrogen gas plant , liquid oxygen plant , liquid nitrogen plant , special gas plant ... 

Q2. What is your terms of payment? 

A: T/T 30% as deposit, and 70% T/T or L/C at sign before delivery. Welcome to inspect the products before you pay the balance. 

Q3. What is your terms of delivery? 

A: EXW, FOB, CFR, CIF. 

Q4. How about your delivery time? 

A: Generally, it will take 60 to 90 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. 

Q5. Can you produce according to the client's request ? 

A: Yes, we can produce by your request or technical drawings. We can build the molds and fixtures. 

Q6: How do you make our business long-term and good relationship? 

A:1. We keep good quality and competitive price to ensure our customers benefit ; 

2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from. 

For more details please contact me , Welcome to visit our factory



Previous: 
Next: