Service Flowchart for Zhejiang Jinhua Air Separation Equipment Co., Ltd.
Phase 1: Requirements Alignment & Solution Design
Client Inquiry
Submission of equipment parameters/scenario requirements Preliminary technical feasibility assessment by sales engineers
In-depth Technical Alignment
On-site technical team evaluation (or remote data collection , On line meeting ) Delivery of Customized Air Separation Equipment Proposal (including energy consumption analysis and process flow diagrams)
Commercial Confirmation
Signed quotation (with FOB/CIF terms clarification) Delivery timeline commitment letter
Phase 2: Production & Quality Control
Modular Manufacturing
Segmented prefabrication: molecular sieve systems, distillation columns, compressor units Third-party inspection reports for critical components (e.g., cryogenic valves)
Integrated Debugging
In-house simulated operational condition integrated testing (verification of O₂/N₂ purity, dew point, etc.) Issuance of Factory Performance Certification